Demolish the Samsen Police Station building.
The project to repair the sinkhole on Samsen Road has been aimed at clearing the road and opening it to traffic. Over the past 10 days, however, changes have occurred at Samsen Police Station. The major turning point that led to the conclusion that the station must be demolished was the discovery that a pillar was broken, starting with the fifth pillar on the far right, which has had an impact on the third pillar and the collapse of the building floor. สล็อต 888